Project Details

This page displays current information for project DIME:211216.

Project Information

Project IdentifiersProject ID: 211216
Permit Numbers: 1115NUJ0564
DIST-CO-RTE-PM11-IMP-8-39.47/39.47
Award Date06/23/2015
Closeout Date08/07/2018
Work Descriptionenter upon State Highway right of way in Imperial County, City of El Centro, on Route 8, post mile R39.47, to install water pipeline by jack and bore, in accordance with the requirements and conditions contained herein and as further directed or approved by the State's Resident Engineer, Shawn R
Location DescriptionINTERSTATE 8, EL CENTRO
QA Service LevelNOT VERIFIED

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
No results found.

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods