Project Details
This page displays current information for project DEA: 081C7404.
Project Information
| Project Identifiers | Project ID: 211098 DEA: 081C7404 EFIS: 0813000008 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-43.2/43.4 |
| Award Date | 03/03/2016 |
| Closeout Date | 05/10/2017 |
| Work Description | INSTALL TRAFFIC SIGNALS |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 06/06/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| inderjeet.harika@dot.ca.gov | Harika Inderjeet | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2016-06-23-3 | 06/23/2016 | 06/24/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2016-06-23-2 | 06/23/2016 | 06/24/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
