Project Details
This page displays current information for project DEA: 05330784.
Project Information
| Project Identifiers | Project ID: 211004 DEA: 05330784 EFIS: 0512000076 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-46-46.0/50.2 |
| Award Date | 02/10/2016 |
| Closeout Date | 10/15/2019 |
| Work Description | CONVERT 2-LANE TO 4 LANE EXPRESSWAY. |
| Location Description | NEAR SHANDON FROM 0.2 MILE EAST OF MCMILLIAN CANYON ROAD TO 0.4 MILE WEST OF LUCY BROWN ROAD |
| QA Service Level | 1 (Verified on 01/08/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| amy.c.norris@dot.ca.gov | Amy Norris | Resident Engineer | Caltrans RE DB |
| nicholas.heisdorf@dot.ca.gov | Nick Heisdorf | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-05-21-5 | 05/21/2018 | 05/25/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2017-06-27-2 | 06/27/2017 | 06/27/2017 | Verification | SMTL TM3 - Fastener Assembly | View |
| 2017-03-31-6 | 03/31/2017 | 04/04/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2016-12-07-7 | 12/07/2016 | 12/09/2016 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2016-12-07-6 | 12/07/2016 | 12/09/2016 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2016-12-07-5 | 12/07/2016 | 12/09/2016 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2016-12-01-1 | 12/01/2016 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
| 2016-09-09-8 | 09/09/2016 | 09/19/2016 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2016-06-20-5 | 06/20/2016 | 06/22/2016 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
