Project Details
This page displays current information for project DIME:210841.
Project Information
| Project Identifiers | Project ID: 210841 Permit Numbers: 0614NSN0388 0615NRT0134 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-99-20.164/20.164 |
| Award Date | 08/12/2014 |
| Closeout Date | 04/27/2018 |
| Work Description | Enter upon the State Highway Right-of-way on northbound State Route 99 (FRE/99) in Fresno County at post mile 20.164 (Ventura Street) to set up, maintain, and remove temporary traffic control necessary to install the traffic signals, signs, loops and restriping. Work included, but not limited: ins |
| Location Description | Intersection of N/B SR99 offramp & Ventura Ave, Fresno |
| QA Service Level | 1 (Verified on 10/01/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ramiro.hernandez@dot.ca.gov | Ramiro Hernandez | Resident Engineer | Caltrans RE DB |
| ernie.garcia@fresno.gov | Ernie Garcia | Oversight Resident Engineer | Caltrans REO DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
