Project Details
This page displays current information for project DEA: 042G5214.
Project Information
| Project Identifiers | Project ID: 210621 DEA: 042G5214 EFIS: 0414000064 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-580,680-I-580(PM19.4/46.0)&I-680(PM3.3/21.7) |
| Award Date | 09/30/2015 |
| Closeout Date | 01/03/2018 |
| Work Description | UPGRADE TRANSITION RAILING AT VARIOUS LOCATIONS |
| Location Description | ALAMEDA COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 09/16/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| wondwosen.alemayehu@dot.ca.gov | Wondwosen Alemayehu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2016-06-10-15 | 06/10/2016 | 06/29/2016 | Quality Assurance | Concrete | View |
| 2016-05-23-10 | 05/23/2016 | 06/10/2016 | Verification | Concrete | View |
| 2016-02-26-4 | 02/26/2016 | 03/07/2016 | Quality Control | Concrete | View |
| 2016-02-10-3 | 02/10/2016 | 02/16/2016 | Quality Control | Concrete | View |
| 2016-02-10-2 | 02/10/2016 | 02/16/2016 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
