Project Details
This page displays current information for project DEA: 010B03U4.
Project Information
| Project Identifiers | Project ID: 210608 DEA: 010B03U4 EFIS: 0115000059 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-96-8.3/8.9 |
| Award Date | 10/13/2015 |
| Closeout Date | 11/27/2018 |
| Work Description | SOLDIER PILE WALL WITH GROUND ANCHORS, HMA, GABION WALL AND DRAINAGE |
| Location Description | HUMBOLDT COUNTY NEAR HOOPA FROM TISH TANG SIDEHILL VIADUCT #2 TO 0.3 MILE WEST OF SHOEMAKER ROAD |
| QA Service Level | 1 (Verified on 09/23/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| heidi.quintrell@dot.ca.gov | Heidi Quintrell | Resident Engineer | Caltrans RE DB |
| mike.mccracken@dot.ca.gov | Mike McCracken | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2016-04-06-12 | 04/06/2016 | 04/07/2016 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
