Project Details
This page displays current information for project DEA: 043A2304.
Project Information
| Project Identifiers | Project ID: 210599 DEA: 043A2304 COOP: 042320A5 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-101-25.9/26.3 |
| Award Date | Not set |
| Closeout Date | 08/19/2019 |
| Work Description | Reconstruction of the Airport Boulevard Interchange, and (b) implementation of improvements to the traffic operations |
| Location Description | On US 101 between Airport Boulevard and Fulton Road, in Sonoma County |
| QA Service Level | 1 (Verified on 08/19/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
