Project Details
This page displays current information for project DEA: 072W7504.
Project Information
| Project Identifiers | Project ID: 210531 DEA: 072W7504 EFIS: 0713000448 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405,710-1.6/15.8,7.8/10.9 |
| Award Date | 06/30/2015 |
| Closeout Date | 05/17/2016 |
| Work Description | TREAT BRIDGE DECK SURFACE AND REPLACE BRIDGE JOINT SEALS. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS ON ROUTE 405 FROM WOODRUFF AVENUE UNDERCROSSING TO 182ND STREET UNDERCROSSING AND ON ROUTE 710 FROM WILLOW STREET OVERCROSSING TO DEL AMO BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 08/10/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kevin.bui@dot.ca.gov | Kevin Bui | Resident Engineer | Caltrans RE DB |
| bernabe.contreras@dot.ca.gov | Bernabe Contreras Jr | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
