Project Details
This page displays current information for project DIME:210522.
Project Information
| Project Identifiers | Project ID: 210522 Permit Numbers: 0412NMC1020 0414NRD0754 0414NRD1882 0415NRT0829 |
|---|---|
| DIST-CO-RTE-PM | 04-MRN-101-11.25/11.25 |
| Award Date | 03/24/2014 |
| Closeout Date | 09/14/2018 |
| Work Description | Perform construction of pedestrian and bicycle improvements on Hetherton St. between Mission Ave. and Fourth St. new curb, gutter, concrete sidewalk, and a 10-inch wide multi-use path along with storm drain improvements, irrigation and landscaping improvements, traffic signal modifications and inst |
| Location Description | Hetherton Street , San Rafael |
| QA Service Level | 1 (Verified on 05/14/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| amir.etezadi@dot.ca.gov | Amir Hatefi | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
