Project Details
This page displays current information for project EFIS: 0800000301.
Project Information
| Project Identifiers | Project ID: 210516 EFIS: 0800000301 Permit Numbers: 0814AOP0729 0814AOP0729 0815ADP0309 0815ARW0202 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV--17.8/19.2 |
| Award Date | 03/01/2015 |
| Closeout Date | 06/23/2021 |
| Work Description | Enter onto Interstate 215 right-of-way at Newport Road Interchange in Menifee, within Riverside County, to construct interchange and roadway improvements, as per plan date stamped August 15, 2014 by California Department of Transportation Encroachment Permit Office and/or as directed by Caltrans Re |
| Location Description | Newport Road, Menifee |
| QA Service Level | 1 (Verified on 05/13/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
