Project Details
This page displays current information for project DEA: 080F6314.
Project Information
| Project Identifiers | Project ID: 210489 DEA: 080F6314 EFIS: 0813000220 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-395-11.2/16.6 |
| Award Date | Not set |
| Closeout Date | 08/19/2021 |
| Work Description | The scope of project is widening approximately 5 miles of US 395 from two lanes to four lanes, repave existing lanes, modify five signals, upgrade ADA access, add turn lanes, add sound walls, and extend bridge |
| Location Description | Project Limits are PM 11.2 from 16.6 and US 395. |
| QA Service Level | 2 (Verified on 01/03/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nabil.fraywat@arcadis-us.com | Nabil Fraywat | Resident Engineer | Caltrans RE DB |
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-01-24-17 | 01/24/2020 | 01/29/2020 | Verification | Aggregate | View |
| 2015-03-10-20 | 03/10/2015 | 03/12/2015 | Preliminary | Soil | View |
| 2015-03-10-19 | 03/10/2015 | 03/12/2015 | Preliminary | Soil | View |
| 2015-03-10-18 | 03/10/2015 | 03/12/2015 | Preliminary | Soil | View |
| 2015-03-10-17 | 03/10/2015 | 03/12/2015 | Preliminary | Soil | View |
| 2015-03-10-16 | 03/10/2015 | 03/12/2015 | Preliminary | Soil | View |
| 2015-03-10-15 | 03/10/2015 | 03/12/2015 | Preliminary | Soil | View |
| 2015-03-10-14 | 03/10/2015 | 03/12/2015 | Preliminary | Soil | View |
| 2015-03-10-13 | 03/10/2015 | 03/12/2015 | Preliminary | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
