Project Details
This page displays current information for project DEA: 08432724.
Project Information
| Project Identifiers | Project ID: 210409 DEA: 08432724 EFIS: 0800020178 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-8-RIV-15-6.4/9.7 |
| Award Date | 05/01/2023 |
| Closeout Date | Not set |
| Work Description | Collector/distributor system, new on-ramps, bridges, RW, sound walls, drainage, signal and lighting, signage, freeway widening |
| Location Description | I-15 from Winchester Road to I-215 Junction in Temecula |
| QA Service Level | 2 (Verified on 06/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Mike.Bergevin@dot.ca.gov | Mike Bergevin | Resident Engineer | Caltrans RE DB |
| jrojas@falcon-ca.com | Juan Rojas | Oversight Resident Engineer | Caltrans REO DB |
| Arnel.Vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
| swalker@falcon-ca.com | Scott Walker | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 45 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-17-99 | 06/17/2025 | 06/19/2025 | Verification | Asphalt Rubber Binder | View |
| 2025-06-17-67 | 06/17/2025 | 06/19/2025 | Verification | Asphalt Binder | View |
| 2025-06-17-64 | 06/17/2025 | 06/19/2025 | Verification | Hot Mix Asphalt | View |
| 2025-06-17-53 | 06/17/2025 | 06/19/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-06-17-52 | 06/17/2025 | 06/19/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-06-17-51 | 06/17/2025 | 06/19/2025 | Verification | Aggregate | View |
| 2024-01-16-45 | 01/16/2024 | 01/23/2024 | Quality Control | Concrete | View |
| 2024-01-15-19 | 01/15/2024 | 01/22/2024 | Quality Control | Concrete | View |
| 2024-01-12-35 | 01/12/2024 | 01/22/2024 | Quality Control | Concrete | View |
| 2024-01-10-55 | 01/10/2024 | 01/22/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods