Project Details
This page displays current information for project DEA: 07286301.
Project Information
| Project Identifiers | Project ID: 210199 DEA: 07286301 EFIS: 0713000216 COOP: 074932 |
|---|---|
| DIST-CO-RTE-PM | 07-LA--66/70 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Widen Route 138 to 4 lanes with a median turn lane and standard width shoulder. |
| Location Description | IN LOS ANGELES COUNTY IN PALMDALE FROM 0.4 MILE WEST OF 190TH STREET EAST TO ROUTE 18 JUNCTION |
| QA Service Level | 2 (Verified on 02/02/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-07-08-20 | 07/08/2015 | 07/29/2015 | Preliminary | Soil | View |
| 2015-07-08-19 | 07/08/2015 | 07/29/2015 | Preliminary | Soil | View |
| 2015-07-08-18 | 07/08/2015 | 07/29/2015 | Preliminary | Soil | View |
| 2015-07-14-10 | 07/14/2015 | 07/29/2015 | Preliminary | Soil | View |
| 2015-07-14-9 | 07/14/2015 | 07/29/2015 | Preliminary | Soil | View |
| 2015-07-07-9 | 07/07/2015 | 07/29/2015 | Preliminary | Soil | View |
| 2014-12-11-2 | 12/11/2014 | 12/11/2014 | Preliminary | Soil | View |
| 2014-12-11-1 | 12/11/2014 | 12/11/2014 | Preliminary | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
