Project Details
This page displays current information for project DEA: 043G4864.
Project Information
| Project Identifiers | Project ID: 210041 DEA: 043G4864 EFIS: 0412000086 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-92-14.4/18.8 |
| Award Date | 12/18/2015 |
| Closeout Date | 08/22/2018 |
| Work Description | CLEAN AND PAINT STRUCTURAL STEEL ON BRIDGE |
| Location Description | IN SAN MATEO AND ALAMEDA COUNTIES ON ROUTE 92 AT SAN MATEO HAYWARD |
| QA Service Level | 1 (Verified on 11/05/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| minh.hinh@dot.ca.gov | Minh Hinh | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 19 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2017-05-16-1 | 05/16/2017 | 05/17/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-05-04-3 | 05/04/2017 | 05/05/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-04-14-1 | 04/14/2017 | 04/14/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-04-05-7 | 04/05/2017 | 04/05/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-04-05-6 | 04/05/2017 | 04/05/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-04-05-5 | 04/05/2017 | 04/05/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-04-05-4 | 04/05/2017 | 04/05/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-03-28-11 | 03/28/2017 | 03/30/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-03-28-10 | 03/28/2017 | 03/30/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-03-28-9 | 03/28/2017 | 03/30/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
