Project Details
This page displays current information for project DEA: 072W5404.
Project Information
| Project Identifiers | Project ID: 209920 DEA: 072W5404 EFIS: 0713000206 |
|---|---|
| DIST-CO-RTE-PM | 07-KER-5725- |
| Award Date | 12/22/2014 |
| Closeout Date | 05/06/2016 |
| Work Description | CONSTRUCT WASH BUILDING FACILITY. |
| Location Description | KERN COUNTY IN LEBEC AT THE LEBEC MAINTENANCE STATION AT 1586 LEBEC SERVICE ROAD |
| QA Service Level | 1 (Verified on 12/29/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| efraim.chavez@dot.ca.gov | Efraim Chavez | Resident Engineer | Caltrans RE DB |
| pratheep.piratheepan@dot.ca.gov | Paramananthan Piratheepan | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 16 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-10-23-9 | 10/23/2015 | 11/06/2015 | Quality Control | Concrete | View |
| 2015-03-12-9 | 03/12/2015 | 04/16/2015 | Department Acceptance | Aggregate | View |
| 2015-03-12-8 | 03/12/2015 | 04/16/2015 | Verification | Soil | View |
| 2015-03-12-7 | 03/12/2015 | 04/16/2015 | Verification | Soil | View |
| 2015-10-06-3 | 10/06/2015 | 08/11/2015 | Department Acceptance | Aggregate | View |
| 2015-08-19-5 | 08/19/2015 | 08/24/2015 | Quality Control | Concrete | View |
| 2015-08-06-5 | 08/06/2015 | 08/11/2015 | Quality Control | Concrete | View |
| 2015-07-16-10 | 07/16/2015 | 07/20/2015 | Annual Source Testing | Aggregate | View |
| 2015-06-29-10 | 06/29/2015 | 07/01/2015 | Department Acceptance | Aggregate | View |
| 2015-06-04-15 | 06/04/2015 | 06/08/2015 | Annual Source Testing | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
