Project Details
This page displays current information for project DEA: 07259024.
Project Information
| Project Identifiers | Project ID: 209916 DEA: 07259024 EFIS: 0713000046 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5,10,91,110,134-Var |
| Award Date | 12/31/2014 |
| Closeout Date | 08/03/2023 |
| Work Description | INSTALL AUSTIN VAULT SAND FILTERS AND BIOFILTRATION SWALE AND STRIPS |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 07/09/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| adriana.pimienta@dot.ca.gov | Adriana Pimienta | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2016-02-10-6 | 02/10/2016 | 02/23/2016 | Quality Control | Concrete | View |
| 2015-11-06-5 | 11/06/2015 | 11/09/2015 | Quality Control | Concrete | View |
| 2015-10-23-10 | 10/23/2015 | 11/09/2015 | Quality Control | Concrete | View |
| 2015-08-10-10 | 08/10/2015 | 08/11/2015 | Department Acceptance | Soil | View |
| 2015-09-18-3 | 09/18/2015 | 09/23/2015 | Quality Control | Concrete | View |
| 2015-08-31-8 | 08/31/2015 | 09/17/2015 | Quality Control | Concrete | View |
| 2015-08-07-5 | 08/07/2015 | 08/11/2015 | Quality Control | Concrete | View |
| 2015-07-20-4 | 07/20/2015 | 07/24/2015 | Quality Control | Concrete | View |
| 2015-07-03-1 | 07/03/2015 | 07/10/2015 | Quality Assurance | Concrete | View |
| 2015-06-17-3 | 06/17/2015 | 06/22/2015 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
