Project Details
This page displays current information for project DEA: 100W1904.
Project Information
| Project Identifiers | Project ID: 209704 DEA: 100W1904 EFIS: 1000020456 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-99-22.9/38.8 |
| Award Date | 12/19/2014 |
| Closeout Date | 01/23/2017 |
| Work Description | PAVEMENT RESURFACING |
| Location Description | SAN JOAQUIN COUNTY IN AND NEAR LODI FROM HAMMER LANE OVERCROSSING TO SACRAMENTO COUNTY LINE |
| QA Service Level | 1 (Verified on 08/07/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| troy.scheiber@dot.ca.gov | Troy Scheiber | Resident Engineer | Caltrans RE DB |
| brandon.miller@dot.ca.gov | Brandon Miller | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 14 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-06-25-10 | 06/25/2015 | 06/30/2015 | Quality Control | Concrete | View |
| 2015-06-18-14 | 06/18/2015 | 06/30/2015 | Quality Control | Concrete | View |
| 2015-06-16-6 | 06/16/2015 | 06/30/2015 | Quality Control | Concrete | View |
| 2015-06-23-6 | 06/23/2015 | 06/30/2015 | Quality Control | Concrete | View |
| 2015-06-08-3 | 06/08/2015 | 06/11/2015 | Quality Control | Concrete | View |
| 2015-05-27-6 | 05/27/2015 | 05/29/2015 | Verification | Concrete | View |
| 2015-05-19-4 | 05/19/2015 | 05/29/2015 | Verification | Concrete | View |
| 2015-05-13-5 | 05/13/2015 | 05/15/2015 | Verification | Concrete | View |
| 2015-04-28-1 | 04/28/2015 | 05/01/2015 | Verification | Concrete | View |
| 2015-04-21-13 | 04/21/2015 | 05/01/2015 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
