Project Details
This page displays current information for project DEA: 041A5514.
Project Information
| Project Identifiers | Project ID: 209573 DEA: 041A5514 EFIS: 0400000496 |
|---|---|
| DIST-CO-RTE-PM | 04-SF-101,280-1.5/1.8,R4.1/R4.4 |
| Award Date | 09/12/2014 |
| Closeout Date | 01/20/2016 |
| Work Description | REPLACE BARRIER RAILINGS |
| Location Description | THE CITY AND COUNTY OF SAN FRANCISCO ON ROUTE 101 AND ROUTE 280 AT ROUTE 101/280 SEPARATION. |
| QA Service Level | 1 (Verified on 05/12/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jose.david@dot.ca.gov | Jose David | Resident Engineer | Caltrans RE DB |
| nick.tsai@dot.ca.gov | Nick Tsai | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 20 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-07-15-7 | 07/15/2015 | 07/23/2015 | Quality Control | Concrete | View |
| 2015-06-03-3 | 06/03/2015 | 06/04/2015 | Verification | Concrete | View |
| 2015-06-03-2 | 06/03/2015 | 06/04/2015 | Verification | Concrete | View |
| 2015-06-03-1 | 06/03/2015 | 06/04/2015 | Verification | Concrete | View |
| 2015-04-23-9 | 04/23/2015 | 05/14/2015 | Verification | Concrete | View |
| 2015-04-10-5 | 04/10/2015 | 04/15/2015 | Verification | Concrete | View |
| 2015-04-10-4 | 04/10/2015 | 04/15/2015 | Verification | Concrete | View |
| 2015-04-10-3 | 04/10/2015 | 04/15/2015 | Verification | Concrete | View |
| 2015-04-01-5 | 04/01/2015 | 04/03/2015 | Verification | Concrete | View |
| 2015-04-01-4 | 04/01/2015 | 04/03/2015 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
