Project Details
This page displays current information for project DIME:209561.
Project Information
| Project Identifiers | Project ID: 209561 Permit Numbers: 04136US0860 04146RW1523 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-12-34.8/35 |
| Award Date | 07/01/2013 |
| Closeout Date | 01/21/2019 |
| Work Description | PG&E is eliminating nine (9)High pressure Regulators,installing 1865'of 4" plastic gas main outside of fog line on the west shoulder. |
| Location Description | 17496 to 18002 Sonoma HWY 12, Boyes Hot Springs |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
