Project Details
This page displays current information for project DEA: 04152724.
Project Information
| Project Identifiers | Project ID: 209544 DEA: 04152724 EFIS: 0412000628 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-4,242-R8.0/25.2&0.0/3.4 |
| Award Date | 08/12/2014 |
| Closeout Date | 12/22/2017 |
| Work Description | INSTALL RAMP METERING AND TOS ELEMENTS. |
| Location Description | CONTRA COSTA COUNTY AT VARIOUS LOCATIONS ON RTE 4 FROM WEST OF ALHAMBRA AVENUE TO EAST OF LOVERIDGE ROUTE D AND ON RTE 242 FROM ROUTE 680 TO ROUTE 4. |
| QA Service Level | 1 (Verified on 05/20/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ranjeet.singh@dot.ca.gov | RANJEET SINGH | Resident Engineer | Caltrans RE DB |
| mathew.abel@dot.ca.gov | Mathew Abel | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 25 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-11-12-13 | 11/12/2015 | 12/09/2015 | Verification | Concrete | View |
| 2015-10-27-6 | 10/27/2015 | 11/09/2015 | Quality Control | Concrete | View |
| 2015-09-30-8 | 09/30/2015 | 10/12/2015 | Quality Control | Concrete | View |
| 2015-08-12-4 | 08/12/2015 | 08/18/2015 | Quality Control | Concrete | View |
| 2015-08-06-8 | 08/06/2015 | 08/14/2015 | Quality Control | Concrete | View |
| 2015-08-04-9 | 08/04/2015 | 08/14/2015 | Quality Control | Concrete | View |
| 2015-07-29-9 | 07/29/2015 | 08/14/2015 | Quality Control | Concrete | View |
| 2015-07-24-6 | 07/24/2015 | 08/10/2015 | Quality Control | Concrete | View |
| 2015-07-24-5 | 07/24/2015 | 08/10/2015 | Quality Control | Concrete | View |
| 2015-07-20-5 | 07/20/2015 | 08/10/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
