Project Details
This page displays current information for project DEA: 080Q7403.
Project Information
| Project Identifiers | Project ID: 209511 DEA: 080Q7403 EFIS: 0800020456 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15-15.4/30.8 |
| Award Date | 10/29/2013 |
| Closeout Date | Not set |
| Work Description | Design Build project provides pavement rehabilitation (including ramps) on I-15 near Cajon Pass, CA. |
| Location Description | On I-15 from 0.4 mile north of Kenwood Avenue to 0.3 mile south of West Hesperia OH |
| QA Service Level | 1 (Verified on 04/03/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Maged.Youssef@dot.ca.gov | Maged Youssef | Resident Engineer | Caltrans RE DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 42 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-02-05-26 | 02/05/2022 | 02/09/2022 | Per Request | Asphalt Rubber Binder | View |
| 2016-04-18-5 | 04/18/2016 | 04/21/2016 | Quality Assurance | Concrete | View |
| 2016-03-17-5 | 03/17/2016 | 03/22/2016 | Quality Assurance | Concrete | View |
| 2016-03-03-2 | 03/03/2016 | 03/08/2016 | Quality Control | Concrete | View |
| 2016-02-10-1 | 02/10/2016 | 02/12/2016 | Quality Control | Concrete | View |
| 2016-01-27-2 | 01/27/2016 | 02/01/2016 | Quality Assurance | Concrete | View |
| 2015-12-10-5 | 12/10/2015 | 12/15/2015 | Quality Assurance | Concrete | View |
| 2015-11-21-3 | 11/21/2015 | 11/24/2015 | Quality Control | Concrete | View |
| 2015-11-17-4 | 11/17/2015 | 11/24/2015 | Quality Control | Concrete | View |
| 2015-11-07-2 | 11/07/2015 | 11/10/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
