Project Details
This page displays current information for project DEA: 060S0004.
Project Information
| Project Identifiers | Project ID: 209378 DEA: 060S0004 EFIS: 0614000104 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-99-7.2 |
| Award Date | Not set |
| Closeout Date | 02/16/2021 |
| Work Description | EMERGENCY OVERHEAD SIGN REPAIRS |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 03/05/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| cary.cruz@dot.ca.gov | Cary Cruz | Resident Engineer | Caltrans RE DB |
| mike.bloom@dot.ca.gov | Mike Bloom Sr | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
