Project Details
This page displays current information for project DEA: 11275604.
Project Information
| Project Identifiers | Project ID: 209363 DEA: 11275604 EFIS: 1100000277 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-15-54.0 |
| Award Date | 04/07/2014 |
| Closeout Date | 08/01/2018 |
| Work Description | INSTALL GENERATOR, RECONSTRUCT BUILDING, AND CCTV. |
| Location Description | SAN DIEGO COUNTY AT RAINBOW AT THE SOUTHBOUND RAINBOW TRUCK INSPECTION FACILITY |
| QA Service Level | 1 (Verified on 11/26/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| phong.t.le@dot.ca.gov | Phong T. Le | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
