Project Details
This page displays current information for project DEA: 044S6204.
Project Information
| Project Identifiers | Project ID: 209290 DEA: 044S6204 EFIS: 0414000074 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-1-34.3/34.7 |
| Award Date | 04/14/2014 |
| Closeout Date | 07/17/2015 |
| Work Description | CONSTRUCT SOLDIER PILE TIE-BACK WALL AND WIDENING ROADWAY. |
| Location Description | SONOMA COUNTY NEAR FORT ROSS FROM 0.5 MILE NORTH OF FORT ROSS ROAD TO 0.5 MILE SOUTH OF TIMBER COVE ROAD |
| QA Service Level | 1 (Verified on 02/12/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| scott.hislop@dot.ca.gov | Scott Hislop | Resident Engineer | Caltrans RE DB |
| steve.acton@dot.ca.gov | Steve Acton | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2014-09-23-2 | 09/23/2014 | 09/29/2014 | Verification | Concrete | View |
| 2014-09-23-1 | 09/23/2014 | 09/29/2014 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
