Project Details
This page displays current information for project DIME:209110.
Project Information
| Project Identifiers | Project ID: 209110 Permit Numbers: 0412NMC1476 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-82-13.25/13.25 |
| Award Date | 08/26/2012 |
| Closeout Date | 09/14/2018 |
| Work Description | The work consists of installing an 8" water main within El Camino Real. |
| Location Description | El Camino Real, Burlingame |
| QA Service Level | 1 (Verified on 09/13/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
