Project Details
This page displays current information for project DIME:209006.
Project Information
Project Identifiers | Project ID: 209006 Permit Numbers: 10136UL0322 |
---|---|
DIST-CO-RTE-PM | 10-SJ-26-1.38/1.38 |
Award Date | 07/16/2013 |
Closeout Date | 12/04/2018 |
Work Description | Trench to place one 26"x55"x4' high cabinet on 6'x9' concrete pad; from new cabinet location, trench 10'east to existing joint pole, bore 160' east along edge of right of way to existing cabinet, and trench 132' west along edge of right of way to existing |
Location Description | SR 26, Stockton |
QA Service Level | 1 (Verified on 08/07/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods