Project Details
This page displays current information for project DEA: 100Y2104.
Project Information
| Project Identifiers | Project ID: 208942 DEA: 100Y2104 EFIS: 1013000104 COOP: 10415 |
|---|---|
| DIST-CO-RTE-PM | 10-TUO-108-R4.3/R5.1 |
| Award Date | 07/17/2020 |
| Closeout Date | 05/11/2023 |
| Work Description | MODIFY AND WIDEN STRUCTURE |
| Location Description | AT PEACEFUL OAK ROAD INTERCHANGE ,PART OF EAST SONORA BYPASS |
| QA Service Level | 1 (Verified on 12/06/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-08-02-68 | 08/02/2022 | 10/13/2022 | Department Acceptance | Asphalt Binder | View |
| 2022-07-29-32 | 07/29/2022 | 08/02/2022 | Department Acceptance | Asphalt Binder | View |
| 2022-08-02-24 | 08/02/2022 | 08/03/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-08-01-27 | 08/01/2022 | 08/02/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-08-01-26 | 08/01/2022 | 08/03/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-07-29-23 | 07/29/2022 | 08/01/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-07-29-22 | 07/29/2022 | 08/01/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-06-03-47 | 06/03/2021 | 06/09/2021 | Department Acceptance | Soil | View |
| 2021-05-10-35 | 05/10/2021 | 05/10/2021 | Department Acceptance | Soil | View |
| 2021-04-21-35 | 04/21/2021 | 04/23/2021 | Preliminary | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
