Project Details
This page displays current information for project DEA: 042A1104.
Project Information
| Project Identifiers | Project ID: 208919 DEA: 042A1104 EFIS: 0400000808 |
|---|---|
| DIST-CO-RTE-PM | 04-NAP-121-20.2/20.4PM |
| Award Date | 10/24/2013 |
| Closeout Date | 01/14/2016 |
| Work Description | BRIDGE REMOVAL, BRIDGE REPLACEMENT AND ROADWAY WIDENING. |
| Location Description | NAPA COUNTY ABOUT 2 MILES SOUTH OF JUNCTION OF ROUTE 128 AT CAPELL CREEK BRIDGE. |
| QA Service Level | 1 (Verified on 10/24/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| principe.tenoso@dot.ca.gov | Principe Tenoso | Resident Engineer | Caltrans RE DB |
| chris.moulton@dot.ca.gov | Chris Moulton | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 18 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2014-11-11-3 | 11/11/2014 | 11/12/2014 | Quality Control | Concrete | View |
| 2014-11-11-2 | 11/11/2014 | 11/12/2014 | Quality Control | Concrete | View |
| 2014-11-11-1 | 11/11/2014 | 11/12/2014 | Quality Control | Concrete | View |
| 2014-10-24-3 | 10/24/2014 | 10/28/2014 | Quality Control | Concrete | View |
| 2014-10-24-2 | 10/24/2014 | 10/28/2014 | Quality Control | Concrete | View |
| 2014-10-24-1 | 10/24/2014 | 10/28/2014 | Quality Control | Concrete | View |
| 2014-10-10-5 | 10/10/2014 | 10/14/2014 | Quality Control | Concrete | View |
| 2014-10-10-4 | 10/10/2014 | 10/14/2014 | Quality Control | Concrete | View |
| 2014-10-10-3 | 10/10/2014 | 10/14/2014 | Quality Control | Concrete | View |
| 2014-09-25-4 | 09/25/2014 | 09/26/2014 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
