Project Details
This page displays current information for project DEA: 060C9404.
Project Information
| Project Identifiers | Project ID: 208873 DEA: 060C9404 EFIS: 0600000041 COOP: 061527 Permit Numbers: 0613NMC0448 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-178-7/9.1 |
| Award Date | 05/16/2013 |
| Closeout Date | 12/31/2015 |
| Work Description | Enter upon the State Highway Right-of-way on State Route 178 (SR-178) in Bakersfield at and near the SR-178/Morning Drive intersection (PM R7.0) to set up, maintain, and remove temporary traffic control necessary in order to construct the City of Bakersfi |
| Location Description | SR 178, Bakersfield |
| QA Service Level | 2 (Verified on 07/24/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| wboeck@mendoza-associates.com | Wade Boeck | Oversight Resident Engineer | Caltrans REO DB |
| mike.bloom@dot.ca.gov | Mike Bloom Sr | Structural Representative | Caltrans SR DB |
| jholt@mendoza-associates.com | Joy Holt | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
