Project Details
This page displays current information for project DIME:208792.
Project Information
| Project Identifiers | Project ID: 208792 Permit Numbers: 0412NSN2130 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-VAR--1/-1 |
| Award Date | 09/29/2014 |
| Closeout Date | 08/21/2018 |
| Work Description | Work to be done within Caltrans right-of-way includes: removal and replacement of traffic signal pole and mast arm; installation of Type 1-B POLE and foundation. |
| Location Description | West Grand Ave, Oakland |
| QA Service Level | 1 (Verified on 04/16/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
