Project Details
This page displays current information for project DIME:208633.
Project Information
Project Identifiers | Project ID: 208633 Permit Numbers: 0811NRW1041 0811NMC0027 0811NUM0028 08126DP0175 0811NRW1042 0812NRT1145 0812NRT1144 08126RT1146 |
---|---|
DIST-CO-RTE-PM | 08-RIV-79-13.8/13.8 |
Award Date | 02/17/2011 |
Closeout Date | 06/11/2013 |
Work Description | Enter onto State Route 79 right-of-way at Craig Road to extend the existing 16\" diameter steel casing and the 10\" diameter water pipeline beyond the State\'s Right-of-Way using open trench method as per plans date stamped February 15, 2011 by the Depart |
Location Description | State Route 79, County |
QA Service Level | 1 (Verified on 02/26/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods