Project Details
This page displays current information for project DEA: 04228584.
Project Information
Project Identifiers | Project ID: 2025 DEA: 04228584 EFIS: 0400000654 |
---|---|
DIST-CO-RTE-PM | 04-CC-4-24.1 |
Award Date | Not set |
Closeout Date | 05/07/2019 |
Work Description | LOVER RIDGE ROAD PUMPING PLANT |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
alfonso_gonzalez@dot.ca.gov | ALFONSO GONZALEZ | Resident Engineer | Caltrans RE DB |
john_parcedan@dot.ca.gov | JOHN PARCEDAN | Structural Representative | Caltrans SR DB |
reiss@pbworld.com | ANNA REISS | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
No Data
Sample Types
No Data
Number of Tests
No Data
Test Types
No Data
Material Types
No Data
Test Methods
No Data