Project Details
This page displays current information for project DIME:1554.
Project Information
| Project Identifiers | Project ID: 1554 COOP: 042096 Permit Numbers: 0408NMC0004 0408NDP0223 0409NRT0935 0409NRT1698 0409NRT1323 |
|---|---|
| DIST-CO-RTE-PM | 04-SCL-280-10.3/10.3 |
| Award Date | 06/10/2009 |
| Closeout Date | 08/20/2018 |
| Work Description | Project will construct a cable-stayed bridge over I-280 for use by cyclists and peds. Length will be 503'-4" with a 325' center span and 89'-2" back spans. The two bridge towers and superstructure will be steel. The 13' |
| Location Description | 10300 Torre Ave, Cupertino |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| thomas.k.lowe@dot.ca.gov | THOMAS LOWE | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
