Project Details
This page displays current information for project EFIS: 0000001155.
Project Information
| Project Identifiers | Project ID: 1531 EFIS: 0000001155 Permit Numbers: 0407NMC0122 04096DP0643 0409NRD0771 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-880-0/20.621 |
| Award Date | 05/13/2009 |
| Closeout Date | 04/29/2011 |
| Work Description | Remove and replace top 40 inches of asphalt concrete in the existing roadway of Washington Ave. |
| Location Description | Washington Ave. on ramp to I-880, San Leandro |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| rui.zhang@dot.ca.gov | RUI ZHANG | Resident Engineer | Caltrans RE DB |
| MGoralka@ci.san-leandro.ca.us | Mark Goralka | Oversight Resident Engineer | Caltrans REO DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
