Project Details
This page displays current information for project DEA: 112N2354.
Project Information
| Project Identifiers | Project ID: 1002589 DEA: 112N2354 EFIS: 1124000193 |
|---|---|
| DIST-CO-RTE-PM | 11-SAN DIEGO-76-R8.1/R12.0 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | RTE 76 REHAB - OCEANSIDE, 0.4 MI E OF MELROSE DR TO OLIVE HILL RD/CAMINO DEL REY (11-2N2354) |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/01/2026) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Fahad.Masud@dot.ca.gov | Fahad Masud | Resident Engineer | Caltrans RE DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
| benjamin.haney@dot.ca.gov | Benjamin Haney | District Materials Engineer | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-09-17-94 | 09/17/2026 | 09/25/2026 | Verification | Asphaltic Emulsion | View |
| 2026-09-20-19 | 09/20/2026 | 09/25/2026 | Verification | Asphaltic Emulsion | View |
| 2026-09-09-67 | 09/09/2026 | 09/09/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-09-09-66 | 09/09/2026 | 09/09/2026 | Quality Assurance | Aggregate | View |
| 2026-09-10-69 | 09/10/2026 | 09/09/2026 | Production Start-Up | Aggregate | View |
| 2026-09-10-68 | 09/10/2026 | 09/11/2026 | Production Start-Up | Hot Mix Asphalt | View |
| 2026-09-08-51 | 09/08/2026 | 09/09/2026 | Production Start-Up | Aggregate | View |
| 2026-09-08-50 | 09/08/2026 | 09/09/2026 | Production Start-Up | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
