Project Details
This page displays current information for project DEA: 042X7104.
Project Information
| Project Identifiers | Project ID: 1002539 DEA: 042X7104 EFIS: 0425000144 |
|---|---|
| DIST-CO-RTE-PM | 04-UNKNOWN--unknown |
| Award Date | 06/09/2026 |
| Closeout Date | Not set |
| Work Description | HM1 Pavement |
| Location Description | SOLANO COUNTY NEAR DIXON ON ROUTE 80 AT PEDRICK ROAD OVERCROSSING AND ON ROUTE 113 FROM ROUTE 12 TO 0.3 MILE SOUTH OF PARKWAY BOULEVARD |
| QA Service Level | 1 (Verified on 08/11/2026) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-08-06-66 | 08/06/2026 | 08/10/2026 | JMF Verification | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-318-2026-61 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 08/17/2026 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
