Project Details
This page displays current information for project DEA: 033G7504.
Project Information
| Project Identifiers | Project ID: 1002527 DEA: 033G7504 EFIS: 0325000106 |
|---|---|
| DIST-CO-RTE-PM | 03-BUT-191-0.0/3.4,3.7/6.8 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 08/10/2026) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Husam.Makhoul@dot.ca.gov | Husam Makhoul | Resident Engineer | Caltrans RE DB |
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-08-14-56 | 08/14/2026 | 08/15/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-08-17-47 | 08/17/2026 | 08/18/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-08-07-39 | 08/07/2026 | 08/17/2026 | Quality Assurance | Asphaltic Emulsion | View |
| 2026-08-10-52 | 08/10/2026 | 08/17/2026 | Quality Assurance | Asphaltic Emulsion | View |
| 2026-08-12-45 | 08/12/2026 | 08/17/2026 | Quality Assurance | Asphaltic Emulsion | View |
| 2026-08-14-36 | 08/14/2026 | 08/15/2026 | Quality Assurance | Asphalt Binder | View |
| 2026-08-13-2 | 08/13/2026 | 08/13/2026 | Quality Assurance | Asphalt Binder | View |
| 2026-08-13-1 | 08/13/2026 | 08/13/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-08-12-8 | 08/12/2026 | 08/12/2026 | Quality Assurance | Asphalt Binder | View |
| 2026-08-12-7 | 08/12/2026 | 08/12/2026 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-23-2026-63 | Submittal Authorized For Use | CT D03 - Olivehurst Northern Regional Laboratory | 08/19/2026 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
