Project Details
This page displays current information for project DEA: 033G5104.
Project Information
| Project Identifiers | Project ID: 1002523 DEA: 033G5104 EFIS: 0324000182 |
|---|---|
| DIST-CO-RTE-PM | 03-ED-49-25.2/26.2 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | HWY 49 CULVERTS IN EL DORADO COUNTY FROM 0.1 MI N OF DEL ORO LANE TO 0.5 MI S OF CASCADE LANE (PM 25.2/26.2): CIPP LINERS, RCP CULVERTS, FLUME DOWNDRAIN, RSP, HMA PATCH, EROSION CONTROL, MARKERS |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 08/13/2026) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
