Project Details
This page displays current information for project DEA: 033G7804.
Project Information
| Project Identifiers | Project ID: 1002452 DEA: 033G7804 EFIS: 0325000109 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB-YUB-070 -unkn8.46/13.6 own |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | 0.10' Cold Plane and RHMA-G |
| Location Description | IN YUBA COUNTY AT OLIVEHURST AND LINDA FROM ROUTE 65/70 SEPARATION TO YUBA RIVER BRIDGE |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Manoharan.Selvendran@dot.ca.gov | Manoharan Selvendran | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-07-12-13 | 07/12/2026 | 07/17/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-07-13-50 | 07/13/2026 | 07/17/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-07-14-90 | 07/14/2026 | 07/17/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-07-15-55 | 07/15/2026 | 07/17/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-07-16-45 | 07/16/2026 | 07/20/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-07-19-7 | 07/19/2026 | 07/20/2026 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
