Project Details
This page displays current information for project DEA: 044W4804.
Project Information
| Project Identifiers | Project ID: 1002107 DEA: 044W4804 EFIS: 0422000155 COOP: 043096 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA--R34.5 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THE PROJECT CONSISTS OF BOTH AT-GRADE AND ELEVATED PATHS. THE LINK WOULD EXTEND 6,030 FEET (1.14 MILES) BETWEEN MANDELA PARKWAY ON THE EAST AND THE BAY BRIDGE TRAIL ON THE WEST. THE COMBINED LENGTH OF CLASS I PATHS, AS WELL AS RAMPS AND CONNECTING PATHS F |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
