Project Details
This page displays current information for project DEA: 061H6904.
Project Information
| Project Identifiers | Project ID: 1001955 DEA: 061H6904 EFIS: 0625000252 COOP: NONE |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-190-42.75 |
| Award Date | 07/14/2025 |
| Closeout Date | Not set |
| Work Description | Install Sidehill Viaduct (Bridge No. 46-0285). |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 02/17/2026) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| cesar.mandujano@dot.ca.gov | Cesar Mandujano | Resident Engineer | Caltrans RE DB |
| ye.yang@dot.ca.gov | Ye Yang | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-04-09-14 | 04/09/2026 | Quality Assurance | Concrete | View | |
| 2026-03-23-5 | 03/23/2026 | 03/23/2026 | Quality Control | SMTL TM5 - Headed Bars | View |
| 2026-03-23-4 | 03/23/2026 | 03/26/2026 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2026-03-23-3 | 03/23/2026 | 03/23/2026 | Quality Control | SMTL TM5 - Headed Bars | View |
| 2026-03-23-2 | 03/23/2026 | 03/26/2026 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2026-03-10-8 | 03/10/2026 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2026-03-10-7 | 03/10/2026 | 03/13/2026 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2026-03-10-6 | 03/10/2026 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2026-03-10-5 | 03/10/2026 | 03/13/2026 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
