Project Details
This page displays current information for project DEA: 044X5304.
Project Information
| Project Identifiers | Project ID: 1001910 DEA: 044X5304 EFIS: 0426000087 COOP: NONE |
|---|---|
| DIST-CO-RTE-PM | 04-NAP-29-23.54/23.54 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | REMOVE AND EXISTING CULVERT AND REPLACE WITH CAST IN PLACE BOX CULVERT AND REPAIR ROADWAY REPLACE CULVERT AND REPAIR ROADWAY |
| Location Description | IN NAPA CO. HWY 29 PM 23.54 |
| QA Service Level | 1 (Verified on 01/16/2026) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| angelo.perez@dot.ca.gov | Nestor A 'Angelo' Perez Jr | Structural Representative | Caltrans SR DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 27 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-04-28-75 | 04/28/2026 | 04/29/2026 | Quality Control | Concrete | View |
| 2026-04-28-74 | 04/28/2026 | 05/01/2026 | Quality Control | Aggregate | View |
| 2026-04-22-75 | 04/22/2026 | 04/23/2026 | Quality Control | Concrete | View |
| 2026-04-22-74 | 04/22/2026 | 04/27/2026 | Quality Control | Aggregate | View |
| 2026-04-16-85 | 04/16/2026 | 04/17/2026 | Quality Control | Concrete | View |
| 2026-04-16-84 | 04/16/2026 | 04/20/2026 | Quality Control | Aggregate | View |
| 2026-04-10-58 | 04/10/2026 | 04/11/2026 | Quality Control | Concrete | View |
| 2026-04-10-57 | 04/10/2026 | 04/10/2026 | Quality Control | Aggregate | View |
| 2026-04-07-87 | 04/07/2026 | 04/08/2026 | Quality Control | Concrete | View |
| 2026-04-07-86 | 04/07/2026 | 04/08/2026 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
