Project Details
This page displays current information for project DEA: 051R1004.
Project Information
| Project Identifiers | Project ID: 1001645 DEA: 051R1004 EFIS: 0523000125 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO, -1-32.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | BRIDGE REPLACEMENT, HMA, AND RSP PROTECTION. |
| Location Description | SAN LUIS OBISPO COUNTY NEAR MORRO BAY AT TORO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 11/03/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| dean.russu@bkf.com | Dean Russu | Resident Engineer | Caltrans RE DB |
| dlewis@mnsengineers.com | Dave Lewis | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 24 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-05-05-74 | 05/05/2026 | 05/06/2026 | Quality Assurance | Concrete | View |
| 2026-04-28-73 | 04/28/2026 | 04/29/2026 | Quality Assurance | Concrete | View |
| 2026-04-28-72 | 04/28/2026 | 04/29/2026 | Quality Assurance | Concrete | View |
| 2026-04-28-71 | 04/28/2026 | 04/29/2026 | Quality Assurance | Concrete | View |
| 2026-06-04-3 | 06/04/2026 | 06/11/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-06-04-2 | 06/04/2026 | 06/11/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-05-19-37 | 05/19/2026 | 06/01/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-05-07-59 | 05/07/2026 | 05/13/2026 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
| 2026-04-30-7 | 04/30/2026 | Quality Assurance | SMTL TM5 - Headed Bars | View | |
| 2026-04-30-6 | 04/30/2026 | 05/05/2026 | Quality Assurance | SMTL TM5 - Headed Bars | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
