Project Details
This page displays current information for project DEA: 030J4004.
Project Information
| Project Identifiers | Project ID: 1001641 DEA: 030J4004 EFIS: 0319000280 |
|---|---|
| DIST-CO-RTE-PM | 03-ED-50-18.7/22.9 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC PVMT, HMA, RCP, CONC BARRIER, & STRUCTURAL CONC. |
| Location Description | EL DORADO COUNTY IN AND NEAR PLACERVILLE FROM 0.1 MILE WEST OF CARSON ROAD OVERCROSSING TO 5 MILE ROAD AND FROM 1.0 MILE EAST OF CAMINO HEIGHTS ROAD TO 0.3 MILE EAST OF RIDGEWAY DRIVE UNDERCROSSING |
| QA Service Level | 1 (Verified on 11/12/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nathan.alterton@dot.ca.gov | Nathan Alterton | Resident Engineer | Caltrans RE DB |
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
| addisu.workineh@dot.ca.gov | Addisu Workineh | District Materials Engineer | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-10 of 23 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-09-17-56 | 09/17/2026 | 09/21/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-09-16-34 | 09/16/2026 | 09/17/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-09-15-53 | 09/15/2026 | 09/17/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-09-14-26 | 09/14/2026 | 09/14/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-09-13-5 | 09/13/2026 | 09/14/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-09-10-23 | 09/10/2026 | 09/11/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-09-09-14 | 09/09/2026 | 09/09/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-09-08-15 | 09/08/2026 | 09/08/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-09-02-43 | 09/02/2026 | 09/04/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-08-28-20 | 08/28/2026 | 08/31/2026 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
