Project Details
This page displays current information for project DEA: 11173704.
Project Information
| Project Identifiers | Project ID: 1001625 DEA: 11173704 EFIS: 1100020255 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-2.6/3.2 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | WIDEN INTERCHANGE, STRUCTURES, HMA-A, RHMA-G, LANDSCAPE, & ELECTRICAL. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF PALM AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 03/04/2026) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| karl.hartline@dot.ca.gov | Karl Hartline | Resident Engineer | Caltrans RE DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 31 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-08-25-30 | 08/25/2026 | 08/26/2026 | Quality Assurance | Concrete | View |
| 2026-08-06-91 | 08/06/2026 | 08/06/2026 | Verification | Aggregate | View |
| 2026-08-06-90 | 08/06/2026 | 08/06/2026 | Verification | Hot Mix Asphalt | View |
| 2026-08-17-11 | 08/17/2026 | 08/17/2026 | Quality Assurance | Soil | View |
| 2026-07-20-51 | 07/20/2026 | 07/20/2026 | Quality Assurance | Aggregate | View |
| 2026-08-13-7 | 08/13/2026 | 08/13/2026 | Quality Assurance | Concrete | View |
| 2026-08-10-2 | 08/10/2026 | 08/10/2026 | Quality Assurance | Soil | View |
| 2026-08-06-3 | 08/06/2026 | 08/06/2026 | Quality Assurance | Soil | View |
| 2026-07-15-72 | 07/15/2026 | 07/15/2026 | Verification | Aggregate | View |
| 2026-07-15-71 | 07/15/2026 | 07/15/2026 | Verification | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
