Project Details
This page displays current information for project DEA: 051P2104.
Project Information
| Project Identifiers | Project ID: 1001612 DEA: 051P2104 EFIS: 0521000188 |
|---|---|
| DIST-CO-RTE-PM | 05-MON,-1-44.3 |
| Award Date | 12/19/2025 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT SOLDIER PILE WALL AND STRUCTURAL CONCRETE BARRIER SLAB. |
| Location Description | MONTEREY COUNTY NEAR BIG SUR ABOUT 1.1 MILES SOUTH OF PFEIFFER CANYON BRIDGE |
| QA Service Level | 1 (Verified on 11/03/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| tommy.munro@dot.ca.gov | Tommy Munro | Resident Engineer | Caltrans RE DB |
| Carson.Sperber@dot.ca.gov | Carson Sperber | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-07-30-80 | 07/30/2026 | 07/31/2026 | Quality Control | Concrete | View |
| 2026-07-29-64 | 07/29/2026 | 07/30/2026 | Quality Control | Concrete | View |
| 2026-07-28-82 | 07/28/2026 | 07/29/2026 | Quality Control | Concrete | View |
| 2026-07-27-72 | 07/27/2026 | 07/28/2026 | Quality Control | Concrete | View |
| 2026-07-27-71 | 07/27/2026 | 07/28/2026 | Quality Control | Concrete | View |
| 2026-07-23-68 | 07/23/2026 | 07/24/2026 | Quality Control | Concrete | View |
| 2026-07-22-60 | 07/22/2026 | 07/23/2026 | Quality Control | Concrete | View |
| 2026-07-21-45 | 07/21/2026 | 07/22/2026 | Quality Control | Concrete | View |
| 2026-07-21-44 | 07/21/2026 | 07/22/2026 | Quality Control | Concrete | View |
| 2026-07-17-65 | 07/17/2026 | 07/20/2026 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods