Project Details
This page displays current information for project DEA: 060X2904.
Project Information
| Project Identifiers | Project ID: 1001573 DEA: 060X2904 EFIS: 0618000050 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-33-13.9/16.7 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | HMA (TYPE A), RDWY EXC, CL 2 AB, CURB RAMPS AND MOBILIZATION. |
| Location Description | FRESNO COUNTY IN AND NEAR COALINGA FROM ENTERPRISE PARKWAY TO LOS GATOS CREEK SOUTH CHANNEL BRIDGE |
| QA Service Level | 1 (Verified on 09/15/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
| raafat.shehata@dot.ca.gov | Raafat Shehata | District Materials Engineer | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-10 of 239 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-09-22-58 | 09/22/2026 | 10/02/2026 | Quality Assurance | Asphaltic Emulsion | View |
| 2026-09-17-73 | 09/17/2026 | 09/29/2026 | Quality Assurance | Asphalt Binder | View |
| 2026-09-21-44 | 09/21/2026 | 09/28/2026 | Quality Assurance | Asphaltic Emulsion | View |
| 2026-09-18-41 | 09/18/2026 | 07/23/2026 | Quality Assurance | Asphaltic Emulsion | View |
| 2026-09-17-66 | 09/17/2026 | 07/23/2026 | Quality Assurance | Asphaltic Emulsion | View |
| 2026-09-20-12 | 09/20/2026 | 09/20/2026 | Acceptance | Soil | View |
| 2026-09-20-11 | 09/20/2026 | 09/13/2026 | Acceptance | Soil | View |
| 2026-09-20-10 | 09/20/2026 | 09/20/2026 | Acceptance | Soil | View |
| 2026-09-20-9 | 09/20/2026 | 09/20/2026 | Acceptance | Soil | View |
| 2026-09-20-8 | 09/20/2026 | 09/20/2026 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
