This page displays current information for project DEA: 120K62U4.

Project Information

Project IdentifiersProject ID: 1001469
DEA: 120K62U4
EFIS: 1224000090
DIST-CO-RTE-PM12-ORA,-5-R25.8/30.3
Award Date11/12/2025
Closeout DateNot set
Work DescriptionCONST BRIDGE, RW, SW, PAVEMENT, DRAINAGE, AND ELECTRICAL SYSTEMS.
Location DescriptionORANGE COUNTY IN IRVINE AND TUSTIN FROM YALE AVENUE OVERCROSSING TO ROUTE 5/55 SEPARATION
QA Service Level1 (Verified on 08/13/2025)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
eric.tsang@dot.ca.govEric TsangMETS REPCaltrans METS REP DB
behdad.baseghi@dot.ca.govBehdad BaseghiDistrict Materials EngineerCaltrans District Materials Engineer

Samples

Samples submitted for this project.

Displaying 1-10 of 57 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2026-09-30-4609/30/202608/04/2026Quality ControlAggregateView
2026-09-30-4509/30/2026Quality ControlPrecast ConcreteView
2026-09-21-3409/21/2026Quality ControlPrecast ConcreteView
2026-09-14-4909/14/202608/04/2026Quality ControlAggregateView
2026-09-09-5009/09/202608/04/2026Quality ControlAggregateView
2026-09-11-4409/11/2026Quality ControlPrecast ConcreteView
2026-09-15-3609/15/2026Quality ControlPrecast ConcreteView
2026-09-08-4009/08/202609/16/2026Quality AssuranceSMTL TM5 - CouplersView
2026-09-14-3109/14/2026Quality ControlPrecast ConcreteView
2026-09-10-3909/10/2026Quality ControlPrecast ConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
120K62U42026-09-30-4509/30/2026View
120K62U42026-09-21-3409/21/2026View
120K62U42026-09-15-3609/15/2026View
120K62U42026-09-14-3109/14/2026View
120K62U42026-09-11-4409/11/2026View
120K62U42026-09-10-3909/10/2026View
120K62U42026-09-09-3409/09/2026View
120K62U42026-09-08-3409/08/2026View
120K62U42026-09-04-3309/04/2026View
120K62U42026-09-03-2809/03/2026View

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods