Project Details
This page displays current information for project DEA: 081L2404.
Project Information
| Project Identifiers | Project ID: 1001468 DEA: 081L2404 EFIS: 0819000167 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-95-R57.2/64.5 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | RHMA (GAP GRADED), REPLACE AC SURFACING, AND COLD PLANE AC PVMT. |
| Location Description | SAN BERNARDINO COUNTY NEAR NEEDLES FROM ROUTE 40/95 SEPARATION TO 0.5 MILE NORTH OF GOFFS ROAD |
| QA Service Level | 1 (Verified on 08/29/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| anthony.v.doan@dot.ca.gov | Anthony Doan | Resident Engineer | Caltrans RE DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 54 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-04-17-55 | 04/17/2026 | 04/18/2026 | Verification | Asphalt Rubber Binder | View |
| 2026-04-13-40 | 04/13/2026 | 04/15/2026 | Verification | Asphalt Rubber Binder | View |
| 2026-04-17-54 | 04/17/2026 | 04/18/2026 | Verification | Asphalt Binder | View |
| 2026-04-02-113 | 04/02/2026 | 04/09/2026 | Verification | Asphalt Rubber Binder | View |
| 2026-04-13-36 | 04/13/2026 | 04/15/2026 | Verification | Asphalt Binder | View |
| 2026-04-07-76 | 04/07/2026 | 04/09/2026 | Verification | Asphalt Rubber Binder | View |
| 2026-04-02-112 | 04/02/2026 | 04/09/2026 | Verification | Asphalt Binder | View |
| 2026-04-07-75 | 04/07/2026 | 04/09/2026 | Verification | Asphalt Binder | View |
| 2026-04-22-62 | 04/22/2026 | 04/23/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-04-23-54 | 04/23/2026 | 04/23/2026 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
