Project Details
This page displays current information for project DEA: 120S3804.
Project Information
| Project Identifiers | Project ID: 1001404 DEA: 120S3804 EFIS: 1220000058 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-5-10.0/21.3 |
| Award Date | 10/20/2025 |
| Closeout Date | Not set |
| Work Description | SLAB REPLACEMENT (RSC), RHMA-PAVING, SIGNAL AND LIGHTING MODIFICATION. |
| Location Description | ORANGE COUNTY FROM EL HORNO STREET UNDERCROSSING IN SAN JUAN CAPISTRANO TO ROUTE 405/5 SEPARATION IN IRVINE |
| QA Service Level | 1 (Verified on 09/08/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| artin.merati@dot.ca.gov | Artin Merati | Resident Engineer | Caltrans RE DB |
| Michael.Yee@dot.ca.gov | Michael Yee | Structural Representative | Caltrans SR DB |
| eric.tsang@dot.ca.gov | Eric Tsang | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 26 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-08-10-63 | 08/10/2026 | 08/11/2026 | Quality Assurance | Concrete | View |
| 2026-08-14-2 | 08/14/2026 | 08/21/2026 | Quality Assurance | SMTL TM7 - Epoxy Coated Dowels | View |
| 2026-08-14-1 | 08/14/2026 | 08/21/2026 | Quality Assurance | SMTL TM7 - Epoxy Coated Dowels | View |
| 2026-08-03-48 | 08/03/2026 | 08/05/2026 | Quality Assurance | Concrete | View |
| 2026-07-25-11 | 07/25/2026 | 07/28/2026 | Quality Assurance | Concrete | View |
| 2026-07-20-41 | 07/20/2026 | 07/22/2026 | Quality Assurance | Concrete | View |
| 2026-07-18-12 | 07/18/2026 | 07/20/2026 | Quality Assurance | Concrete | View |
| 2026-07-14-92 | 07/14/2026 | 07/15/2026 | Quality Assurance | Concrete | View |
| 2026-07-13-51 | 07/13/2026 | 07/15/2026 | Quality Assurance | Concrete | View |
| 2026-07-06-65 | 07/06/2026 | 07/07/2026 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
